The marina utilises Livart’s Hybrid Pontoon System, featuring a 200m-long floating concrete attenuator breakwater coupled with aluminium walkways and finger berths. This design provides the strength and wave protection of a full concrete system while maintaining the flexibility and installation efficiency of aluminium components. All modules were fabricated within Livart’s QA-controlled factory and installed to meet the club’s high standards of safety, accessibility, and visual quality.
The new SYC marina delivers enhanced protection, stability, and functionality, providing members with a world-class facility that combines structural innovation and refined presentation.