
MRM Phase III Project - Another Superior Project in Dubai
Mina Rashid Marina Phase III Project (MRM), located in Dubai, is designed specifically for the UAE Royal Super-Yacht, which covers 20 berths for super-yacht of over 50 meters, completed in February, 2019. This project is another outstanding work that Livart is completing in Dubai.
The concrete floating pontoon adopted by the project is a breakwater floating pontoon with a size of 15000*6000*2000 mm, and the gangway in aluminum 6061 T6 material size is 25000*2000 mm. All materials of gangway are shipped from China, the concrete floating pontoon fabrication and casting are mobilized to project site – A best way to save money buy using best quality materials and lowest labor power. One of the big highlights of the project is equipped with world-class floating petrol stations and marine environmental protection equipment, which provides great convenience for the super yacht.
Part of the designed and supplied by Livart Marine, MRM Phase III Project is another excellent project for DP WORLD in cooperation with SHAFA CONSTRUCTION, which has written a new chapter for the development of Livart in Dubai and even in the Middle East.